在线免费亚洲|一生一世电视剧在线高清免费观看|欧美大尺度电影原罪未删减|95av,亚洲精品一区二区三区99,伦敦陷落电影在线观看完整版高清 ,国产成人免费片在线观看

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

Question
Location:Home → Services → Question
How welding operations on the loader
Public date:2015-1-21   Hits:5573

When welding work on the machine, the following provisions shall operate, in order to avoid damage to the machine, or the occurrence of accidents.

1) Before welding, you must read and understand the relevant safety requirements for welding in this machine.

2) Before welding, turn off the engine start switch, disconnect the negative power switch.

3) Before welding, you must remove the instrument panel connector, to avoid damage to the dashboard, you can also harness the cab (in the lower right of the frame is hinged near the cab) and vehicle harness disconnected.

4) continue to use unsustainable over 220V voltage.

5) the welding area and ground cables within a distance of 1 meter.

6) between the weld area and avoid grounding cable seals and bearings.

7) Do not weld or cut have fuel, oil and hydraulic oil pipes and containers.

8) Do not weld or cut a sealed container or poor ventilation.

Previous  |  Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息